Full support for stormwater permitting through California’s SMARTS portal, as part of your Construction SWPPP compliance.
Navigating California’s SMARTS system (Storm Water Multiple Application and Report Tracking System) is a key part of staying compliant with your Construction SWPPP under the Construction General Permit (CGP). Whether you’re building in Los Angeles, San Diego, or San Francisco, SoCal Stormwater Solutions is here to help.
Our team of certified QSP/QSD professionals will manage every SMARTS task on your behalf—from the first submission to project closeout—keeping your site compliant and avoiding costly violations.
We handle all key permit submissions and updates required by the California State Water Resources Control Board as part of your Construction SWPPP process.
A Notice of Intent is the official registration to begin construction under the California CGP.Before construction begins, you’re required to file a Notice of Intent (NOI) through SMARTS to obtain CGP coverage and activate your Construction SWPPP.
We will:
The SWPPP upload makes your site’s stormwater control plan accessible to regulators. Once your Stormwater Pollution Prevention Plan is prepared, it must be uploaded to SMARTS.
We ensure:
Ad Hoc reports are used to submit the sampling results as needed during construction.
We handle:
A COI reports are used to document unexpected changes during construction.
Changes on-site? You must submit a COI through SMARTS.
We handle:
The Annual Report summarizes your site’s stormwater compliance for the year. Sites with an active Construction SWPPP must submit an Annual Report summarizing compliance.
We take care of:
The NOT formally closes your CGP coverage after site stabilization is complete. When your site reaches final stabilization, it’s time to close your Construction SWPPP coverage with a Notice of Termination (NOT).
We provide:
The Erosivity Waiver exempts eligible projects from full permit coverage. If your project qualifies for a waiver, we’ll file your Erosivity Waiver (R-Factor Waiver).
We assist by:
Need help filing your NOI, submitting reports, or closing your project? We manage every SMARTS requirement as part of your Construction SWPPP compliance.
Call (310) 343-8313 now for a brief free consultation.
Our Construction SWPPP services are available in:
By choosing Socal Stormwater Solutions, our clients will always work directly with our superior certified SWPPP Practitioners and Developers (QSP and QSD), the majority of which have 20 or more years of practical experience. As a single point of contact for the aforementioned issues, we become your partner in Erosion Control and Stormwater Management.
© 2025 Socal Stormwater Solutions • All Rights Reserved