Skip to content

Industrial SWPPP – Permitting Process

Start your compliance journey with proper permit coverage under California’s Industrial General Permit (IGP).

Expert Help with Every Step of the Permitting Process

Navigating the permitting process for an Industrial SWPPP in California requires technical knowledge and attention to detail. At SoCal Stormwater Solutions, our certified experts help you complete all required submittals to the State Water Resources Control Board (SWRCB) through the SMARTS system.

Whether you’re managing a warehouse, manufacturing facility, or transportation yard, we make sure your site is fully covered and inspection-ready.

What’s Included in the Industrial SWPPP Permitting Process

Notice of Intent (NOI) Submission

Begin coverage under the IGP.
We file your NOI through the SMARTS system and ensure all supporting documentation is complete. This allows your facility to legally discharge stormwater under the General Permit.

Stormwater Pollution Prevention Plan (SWPPP) Submission

Submit your full SWPPP to the state.
Our team designs, prepares, and uploads your site-specific SWPPP to SMARTS, including your facility description, pollutant sources, BMPs, and monitoring plan.

Ad Hoc Report Submission

Stay in compliance with the state mandate and avoid unnecessary penalties due to the late sampling and Ad Hoc submission. Responsive to changes or inspection updates.
We analyze and submit your sampling results and Ad Hoc reports on time to SMARTS your SMARTS record up-to-date.

Change of Information (COI) Submission

Keep your permit details accurate.
If there are changes to your facility contact, owner, or location information, or other part of the SWPPP, we file a COI submission quickly to avoid gaps in compliance.

Storm Surge Barrier in the Netherlands With Water Passing Through

Annual Report Submission

Meet your year-end reporting requirements.
We collect monitoring data, summarize BMP performance, and submit the full Annual Report on your behalf through SMARTS before the July 15 deadline.

Notice of Termination (NOT) Submission

Officially close your IGP coverage.
When your facility no longer requires permit coverage, we prepare and submit the NOT package, including photos and documentation showing compliance with termination criteria.

No Exposure Certification (NEC) Submission

Qualify for permit exemption if all industrial materials are protected and not exposed to stormwater.
We evaluate your site for NEC eligibility and submit the certification with photographic proof and documentation to avoid unnecessary IGP coverage.

Notice of Non-Applicability (NONA) Submission

Declare exemption when stormwater does not discharge to U.S. waters.
We handle NONA evaluations, complete engineering justification, and prepare the full submission for state review.

Trusted Permit Services Across California

We assist industrial facilities throughout California including:
Los Angeles, Long Beach, Riverside, Palmdale, Ventura, Irvine, San Diego, Fresno, San Jose, San Francisco and Sacramento.

 

Ready to Get Your Industrial SWPPP Filed?

Let us manage your permitting process from NOI to NOT. Avoid delays and compliance risks with the help of certified IGP experts.

Call (310) 343-8313 now for a brief free consultation.