Accurate and fast industrial stormwater documentation for full IGP compliance in California.
To comply with the Industrial General Permit (IGP) in California, every industrial facility must maintain accurate and up-to-date Permit Registration Documents (PRDs).
At SoCal Stormwater Solutions, we prepare all required PRDs to help you avoid costly violations and stay inspection-ready. Our team includes QISP-certified professionals with deep experience in SMARTS compliance, technical writing, and regulatory submission.
Whether your facility is located in Los Angeles, San Diego, San Francisco or anywhere in California, we’ll ensure your compliance documents are accurate and complete.
Each document below plays a vital role in meeting the SWRCB’s industrial stormwater compliance requirements.
The foundation of your stormwater compliance.
We prepare comprehensive SWPPPs tailored to your industrial operations, pollutant sources, BMPs, drainage, and monitoring plans—ready for SMARTS submission.
Visual layout of all pollution control elements.
We create detailed site maps showing flow direction, discharge points, BMP locations, and facility boundaries that meet IGP mapping requirements.
Document sampling results or quickly and correctly.
We prepare ad hoc reports in response to qualified rain event sampling results requirements and ensure they are formatted for SMARTS entry.
Keep your permit record accurate and up to date.
We handle all COI forms when your compliance team changes, business changes ownership, contacts, or legal entity structure or other SWPPP related changes.
Required when your sampling results exceed pollutant benchmarks.
We assess pollutant sources, recommend corrective BMPs, and prepare ERA Level 1 or Level 2 Action and technical plans—complete with timelines, maps, and QISP technical justifications.
Comply with QSE-based sampling and reporting.
We prepare protocols, train staff, and track QSEs (Qualifying Storm Events) to ensure sampling and documentation align with SMARTS rules.
Submit your compliance record each year.
We collect site data, summarize inspections, and prepare the full Annual Report for SMARTS submission by the July 15 deadline.
Close out your permit when coverage is no longer required.
We verify eligibility, collect final documentation, and prepare your NOT submission for regulatory review.
Avoid permit coverage if your site qualifies for NEC.
We evaluate your site and prepare the full NEC packet including photo documentation and facility detail sheets.
Submit a NONA when your site does not discharge to U.S. waters.
We gather hydrologic evidence, draft the engineer justification, and submit the NONA form to the state.
Respond to legal threats from environmental groups.
If your facility receives a 60-day notice of intent to sue, we assess exposure, advise on mitigation, and help prepare technical documentation or revisions needed for legal protection.
Don’t risk violations from incomplete or outdated PRDs. Let our experts prepare everything your facility needs to comply with the IGP.
Call (310) 343-8313
We serve facilities across California in:
Los Angeles, Long Beach, Riverside, Palmdale, Ventura, Irvine, San Diego, Fresno, San Jose, San Francisco and Sacramento.
By choosing Socal Stormwater Solutions, our clients will always work directly with our superior certified SWPPP Practitioners and Developers (QSP and QSD), the majority of which have 20 or more years of practical experience. As a single point of contact for the aforementioned issues, we become your partner in Erosion Control and Stormwater Management.
© 2025 Socal Stormwater Solutions • All Rights Reserved